Snr T&i Engineer Cable Lay - Doha, دولة قطر - Brunel

Brunel
Brunel
شركة تم التحقق منها
Doha, دولة قطر

منذ أسبوع

Aisha Al-Thani

تم النشر بواسطة:

Aisha Al-Thani

مسوّقة للمواهب لبيبي


وصف

The job holder is accountable for demonstrating an exemplary behavior with regard to HSE rules & requirements and for implementing HSE rules within his area of responsibility.


  • The job holder is accountable for all technical and coordination activities under job dimension during project execution from end of FEED to completion of execution offshore, as follows:
  • Defining, implementing, managing and following up all necessary scopes and procedures related to subsea cable lay/loadout/transportations, lifting, surveys, CXings, branching unit setting 3rd party NOL and its shore pull in land fall and connection, and also at Platform side
  • Identify/manage all technical aspects for subsea cable, CXings interfaces Packages during FEED and during project execution between EPC packages for NFL project,
  • Technically manage all T&I related internal and external design, analysis and interfaces, schedule and budget with all parties during project execution in particular
  • Coordinate with other COMPANY and non COMPANY entities during FEED and EPC execution,
  • Coordinate technical matters between contractors and package leads,
  • Coordinate with MP/Engineering for execution of FEED and EPC phases,
  • Technically direct all parties under your remit and when specialist inputs required
  • Prepare and followup PR/Audit sessions during project execution
  • Assist Manager upon request on project management matters during project execution
  • For delivery of high quality engineering dossier for FEED and future EPC phase,
  • Report and liaise with Manager as needed

About this role

  • To promote & comply with applicable safety instructions and other COMPANY HSE procedures in all T&I activities,
  • To carry out work in compliance with COMPANY values and policies, relevant laws and regulations, agreed COMPANY priorities and objectives, COMPANY standards and procedures and good industry practices,
  • To treat all information obtained during course of the work with confidentiality,
  • To establish and manage a team during T&I activities execution which is highly motivated, skilled and works diligently to meet the Package requirements.
  • To establish lean management system in the T&I organization through training, deployment of lean tools and delivery of results.
  • To define the T&I package LOP budget and Work Time Schedule with objective to reduce the costs and optimize the duration and to ensure compliance with these up to Project closeout.
  • To provide Project Management guidance to T&I Contractor to efficiently control his transport and installation activities (from engineering till installation) and ensure proper coordination is made within involved Contractor's entities (engineering, vendors, quality ) and various subcontractors.
  • To keep management regularly and properly informed on T&I package cost and schedule with forecast for the Project completion through an efficient reporting system.
  • To ensure consistence and correct interfacing with other areas during the various phase of EPC detailed design, procurement, fabrication, installation and animate dedicated transverse coordination between packages as required to ensure all requirements for T&I activities are complied.
  • To interface with Field Operations team members in developing SIMOPS and shutdown scope, philosophy and schedule for the site activities with regards to pipelines/cables, risers/Jtubes installation, including installation barge(s) positioning (clear plan to be developed to protect pipelines below).
  • To interface with fabrication yard(s) and T&I Contractor for the loadout of pipes/ cables, risers/ Jtubes, spools, installation aids and various appurtenances, in close cooperation with MWS.
  • To anticipate the offshore activities and ensure Contractor starts in due time preparation of the critical offshore activities (fleet mobilization, loadouts, offshore installation ).
  • In case of drift in schedule, liaise with other team involved (engineering, construction, commissioning) to study remedial actions.
  • Promote a "no change policy" to meet budget and schedule constraint without impairing quality and safety of T&I activities.
  • To manage assistance from shareholders specialists (remote head office), when required during all phases.
  • To define the Project contracting strategy and procurement (LLI) strategies if applicable.
  • To be involved in EPC tenders from preparation of contracting strategy, CFT and bid evaluations including to manage the technical and commercial analysis of offers for contractor selection for EPC.
  • To assist Project management to compile dossier and make presentation to obtain all necessary internal (validation committees TIF, TAC, CPC, CPAC) and external (Shareholders) approvals for Project contract awards.
  • To ensure timely finalization of T&I contractual documents and contract awards for EPC.
  • To manage Detail Engineering and T&I Works progress including followup of engineering and vendor standards and HSE regulation, i

المزيد من الوظائف من Brunel