لم يعد يتم قبول المزيد من الطلبات لهذه الوظيفة
- Performing complete Inspection includes not limited to Receiving, PN / SN recording, Visual, dimension and PT / UT Inspection and report the inspection data and Report.
- Working on the assembly (In-Process) & final acceptance inspections and report the inspection data of components as per established inspection criteria on Gas Turbine Components & Rotors, Centrifugal compressor Rotor & Steam Turbine Rotor.
- Performing Visual, dimensional & other inspection as per drawing / specifications requirements.
- Raising NCR and reject Material disposition cases of nonconforming product.
- Co-ordinating with production personnel for control of nonconforming product, Identify, document and segregate it in holding area until resolution of non-conformity.
- Performing Inspection & prepare inspection reports for non-conformance product i.e. NCR and Hold tag after inspection.
- Actively participating in Root cause analysis for Identification of Root Cause and CAPA actions