حول ABDUL GAFOOR:
I am a qualified trained and experienced QCCD, MMUP/UPDA & Kahramaa LOA Certified Electrical Engineer who has got more than 10 years of rich & extensive experience in various Construction Projects of different Sectors viz., Kahramaa Substations(Loss Prevention), QRail & High Rise Building, etc in Qatar and India
تجربة
WORK EXPERIENCE
Project Engineer
Al Majed Technologies, May 2018 – Present Now
Project Milestones
QATAR GENERAL ELECTRICITY & WATER CORPORATION
CLIENT -KAHRAMAA
MAIN CONTRACTOR-LARSON & TUOBRO CONSULTANT-TRACTEBEL
PH13 -132/11kV OLD AIRPORT-2 SUBSTATION
PH13 -132/11kV AL WAJBAH SUBSTATION
PH13 -66/11kV DOHA INDUSTRIAL-F SUBSTATION(UPGRADE)
PH13 -132/11kV AL ASMAKH SUBSTATION
PH13 -66/11kV Al SADD-2 SUBSTATION
PH13 -132/11kV Al FROOSH-2 SUBSTATION
PH13 -132/11kV Al DAAYEN-2 SUBSTATION
PH13 -66/11kV KTS SUBSTATION
KMCC-AMI CENTER(AL-THUMAMMA)
QATAR GENERAL ELECTRICITY & WATER CORPORATION
CLIENT -KAHRAMAA
MAIN CONTRACTOR- BEST & BETAS CONSORTIUM CONSULTANT- ENERGOPROJEKT ENTEL LTD
PH13 -132/11kV OLD AIRPORT-2 SUBSTATION
PH13 -132/11kV AL WAJBAH-2 SUBSTATION
PH13 -132/11kV AL ZUBRAH SUBSTATION
ASHGAL (PUBLIC WORKS AUTHORITY)
CLIENT -ASHGAL
MAIN CONTRACTOR-BOOM GENERAL CONTRACTORS CONSULTANT-ROYAL
NEW OFFICE AND CAR PARK FOR ASSET AFFAIRS
- Develop and implement effective fire protection designs for compliance with fire codes, standards and regulations.
- Installation of fire protection systems based on the hazard and occupancy and as per the requirement of QCDD/NFPA.
- Preparation of entire BOQ for the project based on the approved Dwg
- Installation, supervision and T&C for the fire alarm systems FM200, fire detection system Deluge & sprinkler system and Fire pumps.
Resolving any unexpected technical difficulties at the project site and other problem that may raise, with the proper coordination to the concerned head.
- Attend meeting at the project site or off-site to address the concerns of architects, engineers, construction managers, and subcontractors.
- Check and verify all the installation of, materials and equipment are ready at the project site and coordinate necessary site inspections with the consultant.
- Preparing isometric and shop layout drawings for firefighting system and detection systems.
- Estimating project scope and procure the materials for the firefighting system include mechanical and electrical.
- Monitoring the daily progress and reporting to the project manager regarding execution.
- Identify and track all changes or potential changes to the project scope ensuring estimates of cost changes and schedule impact are given visibility with the client and project management.
- Preparation and review of the As-built drawings in terms of any changes in the installation
Project Engineer
Argon Global Qatar (AUG’2014- APR’2018)
Project Milestones
Al Baker Tower-Electrical Engineer
Msheireb Downtown-ELV Engineer.
Qatar University-ELV Engineer
- Responsible for installing, programming and testing/commissioning of Lighting Control system.
- Tests & Inspects Jace Box, RB 2000, Controllers, Retractive Switches & Sensors.
- Consistently attends work when scheduled and on time, follows instructions, responds to management direction and solicits feedback to improve performance.
- Attending meetings, writing reports and giving presentations to managers and client. Educating clients on the usage of various security equipment’s provided by the company.
- Complete necessary documents as per the company policy & maintain the records by documentation installation.
- Preparation of Workshop Drawing and Material submittal for consultant approval.
- Preparation of Daily & Weekly program based on one month look ahead program.
- Preparation of the detailed Site quantities requirement based on the consultants’ approved drawings.
- Troubleshoot damaged or faulty installed fire protection systems.
- Schedule all preventive maintenance for completed projects
MEP Engineer
Utility Tech International, Qatar (JUN’2013- AUG’2014)
Project-Q RAIL (Red LINE) - MEP Engineer.
- Construction Supervision of all electrical, mechanical, fire Alarm and Air conditioning works.
- Assisting the Project Manager in the Project Work from the beginning stage till the submission.
- Preparation, execution & monitoring, testing & commissioning of all MEP systems like HVAC, Plumbing & Electrical low current system as per the compliance with plan, shop drawing Specification, Standard and schedule.
- Coordinating and supervising the installation work of electrical items.
- Checking the contractors' As-built electrical drawings for adequacy.
- Monitoring and controlling the day-to-day activities of the electrical inspectors i.e., site work
- inspection as well as inspection of the materials delivered in Contractor’s store.
- Ensuring that inspections are carried out in time and quality of installation and delivered
- materials are maintained as per the relevant specifications/ standards as well as relevant local
- Authority’s regulations/ requirements
- Attending meeting on sites, project reporting, site coordination and Team supervision.
- Reviewing and reporting of the project status.
- Execution of the project engineering involving Delivery, Installation of Cast Iron Drainage Pipes, Coupling, support system, inspection &Leak testing.
Junior Engineer
BEML LTD, INDIA (JUN 2011-APR 2013)
Project-METRO RAIL PROJECT (BANGALORE METRO)
- Responsible for maintaining and repairing heavy equipment required in the day to day working.
- Analysis of machine failures & Estimation of maintenance cost.
- Maintenance of welding machine/ Maintenance of lathe machine.
· Testing and analyzing the dielectric strength of the cables used in the metro cars.
· Testing and commissioning of Electrical Equipment including Meggering.
· Participating in audits and reviews of testing, highlighting areas for improvement.
· Drawings and documentation updates & Responsible for executing test cases, documenting results and defects.
· Attending meetingson site& Preparation of Electrical procedures for installationtest & Commissioning.
- Studied and analyzed the Braking system performance of the metro cars. Electrical wiring in brake electrical control unit cubical. Checking the end-to-end continuity of equipment in Metro cars.
- Preparing Weekly schedule of BMRCL project and BMRCL progress report.
التعليم
Anna University
BE in ELECTRICAL & ELECTRONICS ENGINEERING Graduated First Class
2011
Diploma in Electrical CAD
UPDA accredited Engineer (License No:10824) from Ministry of Municipality and Urban Planning.
Qatar Civil Defense, QCCD certified Engineer with Fire Alarm as Major.
Kahramaa Approved LOA Holder in Substation Loss Prevention System.
المحترفون الذين يتنافسون مع ABDUL
محترفون من نفس قطاع الهندسة\ الهندسة المعمارية مثل ABDUL GAFOOR
محترفون من قطاعات مختلفة بالقرب من Doha, بَلَدِيَّة اَلدَّوْحَة
المستخدمون الآخرون الذين يطلق عليهم ABDUL
وظائف بالقرب من Doha, بَلَدِيَّة اَلدَّوْحَة
-
وظائف شاغرة لدى شركة مادري للهندسة المتكاملة
منذ 19 ساعة
منظمة الصحة العالمية WHO DohaCompany Profile: · منظمة الصحة العالمية - منظمة الصحة العالمية هي جهة عالمية تعمل على تحسين صحة جميع الناس، وتعمل على بناء قدرات الأعضاء الحالية والمستقبلة. تعمل عبر شبكة من أعضاء توافد من جميع أنحاء العالم، وتركز بشكل خاص على الجهود المبذولة لمكافحة الأمراض الرائدة والأوبئة والا ...
- قطر للكيماويات - Qatar Chemical Company Doha
公司 الوظيفة: · شركة قطر للكيماويات - Qatar Chemical Company · المدينة: الدوحة · دولة العمل: قطر · طبيعة العمل: · كاملة · عدد الشواغر: · غير محدد · الراتب المتوقع: · غير محدد · لمحة عن شركة قطر للكيماويات: · شركة رائدة في الصناعات البتروكيماوية في قطر، تلتزم بأعلى معايير السلامة وا ...
-
تعلن قطر للطاقة
منذ أسبوع
منظمة الصحة العالمية WHO Dohaجهة التوظيف: قطر للطاقة - QatarEnergy · مدينة العمل: الدوحة · دولة العمل: قطر · طبيعة الدوام: دوام كامل · عدد الشواغر: غير محدد · الراتب المتوقع: غير محدد · لمحة عن جهة التوظيف: · تأسست قطر للطاقة لعملية استكشاف وإنتاج النفط والغاز في دولة قطر. تعمل على تعزيز مكانة قطر في مجال ال ...