الخدمات المقدمة
Quantity Surveyor Civil, MEP & Infrastructure
السعر التقريبي: 10,000 ر.ق لكل ساعة
الخبرة
| Laying of cables in the excavated trenches including laying of geotextiles, bedding, laying of ducts including all required fittings and accessories, surround as per the required level, warning tapes and backfilling trenches up to the required finish level to receive other structures, cable joints, termination complete in all respects as per project specification and QCS2014. Excluding concrete encasement works |
التعليم
| Laying of cables in the excavated trenches including laying of geotextiles, bedding, laying of ducts including all required fittings and accessories, surround as per the required level, warning tapes and backfilling trenches up to the required finish level to receive other structures, cable joints, termination complete in all respects as per project specification and QCS2014. Excluding concrete encasement works |
