Result-driven and detail-oriented Construction Manager with over 20 years of experience in managing large scale construction Projects, including High- Rise buildings, Power Plant, and Residential Developments. Proven expertise in Project Management, Maintenance, Site Supervision, Quality Control, and Team Leadership. Adept at ensuring projects are completed on time, within Budget, and to the highest Quality standards. Strong problem- solving skills and a commitment to promoting a safety- first culture on construction and Maintenance sites.

الخبرة

Professional Experience

 

 

SAMRYA TRADING & CONTRACTING—Qatar

Construction Manager

*Jan 2012 --- Present

Project: - Vyra Tower (3B+G+44 floors), The Plaza Hotel(5-Star)

 

  • The 5 Star Hotel was completed with top-notch facilities such as a ballroom and courtyard. Terrace swimming pool, terrace BBQ kitchen, bridal area, royal suite, banquet kitchen, two central kitchens, laundry, etc.
  • Oversee the overall construction activities, ensuring adherence to project timelines, budgets, and quality control.
  •  
  • Liaise with supervision teams, subcontractors, and design teams to resolve construction issues and improve work procedures.
  • Collaborate with the QA/QC team to conduct site inspections and close-out walks, ensuring quality control.
  • Promote a zero – accident and injury -free culture on site by implementing safety protocols and risk assessments.
  • Review and approve subcontractors project execution plan and ensure compliance with project requirements.
  • Manage scope, schedule, quality, and budget changes as per client requirements.
  • Monitor project progress and prepare payment bill for subcontractors

 

Project engineer

HYUNDAI HEAVY INDUSTRIES---- Kuwait                                                           

*March 2010—June 2011

Project: Sabiya Power Plant (CCGT)

 

  • Supervise construction activities for the power plant, including the central control building, LV control room, turbine Generator Foundation and cable trench construction.
  • Followed inspection and Test plan for civil, structural, and building works.
  • Prepared weekly and monthly progress reports for stakeholders.
  • Managed materials, logistics, and vendor coordination.
  • Coordinates with technical département for drawing revisions and design changes.

 

Section manager

  AL Dar Laing O, Rourke—Abu Dhabi, UAE

*Feb 2008 to June 2009                                                                               

Project- Al Raha Beach Project (Al Zeina)

  • Supervised all aspects of residential construction Projects, ensuring adherence to design specifications and quality standards.
  • Acted as primary point of contact for the project team during all phases of construction.
  • Monitored project milestones and deliverables, ensuring timely completion
  • Managed project execution to align with budget, schedule, and scope.
  • Prepared weekly and monthly reports and participated in progress meetings.

 

 


 

Construction Manager 

 

ITCC CONSTRUCTION CO, Qatar.                                    

*March 2005—November 2007

ProjectS; Al kharatiyat Villa, Doha Petrol Station Office Building, Renovation of British Council Building.

 

 

  • Ensured timely and within- budget completion of construction projects.
  • Collaborated with Engineers, architects, and subcontractors to resolve construction issues.
  • Consolidated construction reports and communicated project status to the project Manager.
  • Managed materials, logistics, and vendor relationships.
  • Prepared weekly and monthly reports and attended progress meetings.

 

Civil Engineer

Naresco contracting & Trading Co.- Dubai-UAE

*December2001—November 2004

Projects: Jumeirah 06 villas, Al Barsha 12 Villas (Shaikh Zaid housing project)

 

  • Conducted site inspections for civil works, ensuring compliance with project specifications and approved drawings. 
  • Managed manpower and material on site to ensure efficient project execution. 
  • Participated in weekly and monthly meetings with consultants and client representatives. 
  • Prepared daily weekly and monthly progress reports. 
  • Preparing job safety analysis, implementing & ensuring safety measures at the site.

 

التعليم

Bachelor of Engineering: Civil Engineering                                                              

 

 

 

                                                             

المحترفون الذين يتنافسون مع SYED RASHID

محترفون من نفس قطاع هندسة / عمارة مثل SYED RASHID ALI

محترفون من قطاعات مختلفة بالقرب من Doha, بَلَدِيَّة اَلدَّوْحَة

المستخدمون الآخرون الذين يطلق عليهم SYED RASHID

وظائف بالقرب من Doha, بَلَدِيَّة اَلدَّوْحَة

  • Yaqoot aldoha Doha

    المهام والمسؤوليات: · اجتماع مع العملاء لفهم متطلباتهم الخاصة بتصاميم الفلل والمشاريع السكنية والتجارية. · النزول الميداني للمواقع والإشراف على مطابقة التصاميم مع التنفيذ. · ...

  • Site Civil Engineer

    منذ 3 أسابيع

    Lusail international Doha

    +حسناً · +هذه الوظيفة تتطلب مهندس مواقع مدني لديه خبرة في التعامل مع المقاولين من الباطن، ويتمتع بشخصية قوية وقادر على اتخاذ القرارات داخل الموقع. ++يجب أن يكون قادرًا على قراءة وتحليل اللوحات في الموقع، والتعامل مع ورقيات ومراسلات الاستشاري.++كما يجب أن يكون قادرًا على إعداد تقا ...

  • Engineer I

    منذ 4 أسابيع

    Marriott International Doha

    · شركة ماريوت الدولية هي شركة توفر فرص توظيف متكافئة. نؤمن بتوظيف قوى عاملة متنوعة الخلفيات والحفاظ على ثقافة شاملة تهتم بالأشخاص في المقام الأول. · ...